Jackson Solutions

RBARNESJackson Solutions is our consultancy division. It provides early construction advice to clients without the need to let a construction contract. Run as an independent division, Jackson Solutions offers clients expert guidance to move their projects forward into the construction phase.

With over 60 years experience, Jackson understands the commercial magnitude of risks, and our staff are able to identify and solve a range of issues that may not otherwise be picked up until the project is on the ground and a contract has been let. Have a look at some of our case studies to see how Jackson Solutions has put its experience into action and generated substantial cost savings for clients.

Richard Barnes, Divisional Manager

Please enable Java Script in your browser or use a different browser to view this video. You might also need to update your flash player.

Jackson Solutions Case Studies

  • Dartford Tunnel (West)
    Dartford Tunnel (West)   In 2010 Jackson Solutions advised Connect Plus on buildability issues associated with repairs to joints in the road deck in the West tunnel. Originally, the deck had been fabricated outside the tunnel and installed in sections, resulting in numerous joints. The drainage pipework beneath the deck also had to…
  • M54/M6 Toll Link, West Midlands
    M54/M6 Toll Link, West Midlands   Jackson Solutions assisted the client in understanding the construction issues and associated budget estimates to construct a two-lane motorway extension which would link Junction 8 of the M6 Toll with Junction 1 of the M54. Working from Macquarie's previous as built designs from previously completed works, Jackson Solutions produced…
  • M4 Newport, South Wales
    M4 Newport, South Wales   Jackson Solutions were commissioned by ARUP to provide early contractor support into the cost review undertaken on the M4 Relief Road. This included project staffing levels and associated time related costs.
  • M1, Junction 19
    M1, Junction 19   Jackson recently provided advice to the Highways Agency for the remodeling of Junction 19 of the M1. This is where the A14, M1 and M6 converge, which presented major traffic management challenges. Jackson was responsible for advising on all buildability and traffic management issues arising during the junction rebuild,…
  • A12 Interchange, Colchester
    A12 Interchange, Colchester   Jackson was commissioned to provide early contractor support to designers URS for the development of a new grade separated junction on the A12 at Colchester. Jackson advised upon buildability issues including logistical planning, costs and construction phasing.
  • East Belfast Flood Alleviation Scheme and Connswater Community Greenway Project
    East Belfast Flood Alleviation Scheme and Connswater Community Greenway Project   Initially these were two separate projects along the same rivers in East Belfast, however, the clients from each scheme identified that significant cost savings could be generated if the two were combined. Jackson was commissioned in conjunction with Jacobs to provide early contractor support to combine the flood defence…