Latest News

  • Queen going 'green' as hydropower plant nears completion in Windsor
    Queen going 'green' as hydropower plant nears completion in Windsor   Windsor Castle will soon be supplied with green energy after the second of two hydropower turbines was installed by…
  • Long awaited relief road built by Jackson opens in Sittingbourne, Kent
    Long awaited relief road built by Jackson opens in Sittingbourne, Kent A brand new relief road around the town of Sittingbourne, Kent, opened to traffic on schedule last week. Built by…
  • Jackson installs fuel interceptors in Dover Harbour
    Jackson installs fuel interceptors in Dover Harbour Jackson has almost completed a contract to install four fuel interceptors in Dover Harbour. The interceptors have been installed 6.5m…
Subscribe to this RSS feed

Search for projects


  • Bridge
  • Concrete
  • Connect Plus
  • Cool Stuff
  • Cool Stuff That Made Us Proud
  • Dover
  • Environment Agency
  • Fire
  • Flood Defence
  • Fuel Interceptors
  • Green
  • Highways
  • Hull Barrier
  • Hydropower
  • Innovation
  • Roads
  • Seh Bac
  • South
  • The Queen
  • Waterways
  • Windsor Castle

Case Studies

  • M1 Fire Emergency Works
    M1 Fire Emergency Works Jackson was bought in to carry out emergency repair works to the Deansbrook Viaduct on the M1 following a severe scrap-yard fire which started underneath the viaduct in May 2011. The Jackson team worked around the clock to clear debris and install steelwork to reinforce the structure so that the…
  • Dartford QE2 Bridge
    Dartford QE2 Bridge Jackson recently replaced the PTFE strips on two of the bearings on the QE2 Bridge at Dartford. This involved jacking the deck 18mm in order to remove the old strips and install new ones. This job was done overnight, and involved full closure of the eastbound carriageway of the bridge.…
  • Cheltenham Flood Alleviation Scheme
    Cheltenham Flood Alleviation Scheme Jackson constructed a range of flood defence structures, to protect Cheltenham from a one in 100 year flood. Work included the construction of an upstream storage reservoir and control structures, replacement of two existing road bridges to increase capacity, floodwalls comprising bored pile foundations and reinforced concrete capping beams, clad…
  • Romney Weir Emergency Works
    Romney Weir Emergency Works The structure of Romney Weir, on the River Thames had been put under threat when it was discovered that a nine metre scour hole had developed on the downstream side of the weir. If not dealt with quickly, the scour hole could have worsened and caused the weir to collapse.…
  • Westmill Solar Farm
    Westmill Solar Farm Jackson recently completed a contract to install a 22,000 panel solar energy farm in Swindon. The farm will generate up to 5MW of electricity and will be capable of powering up to 1000 homes. This project had a very tight deadline to meet the requirements of the Government's 'Feed In…
  • Carlyon Bay, Cornwall
    Carlyon Bay, Cornwall This was a design and build contract for The Beach at Carlyon Bay, a privately funded resort development. This unique development has been constructed on an existing beach at St Austell and initial works included upgrading and widening the existing narrow cliff road, site clearance and demolition of existing structures.…
  • Welches Dam Pumping Station
    Welches Dam Pumping Station   This was a contract to refurbish an existing pumping station which provides flood protection for 700 homes in the Washes area in Cambridgeshire. Originally commissioned in 1948, the pumping station transfers water from the Counter Drain to the Ouse Washes in periods of heavy rainfall. The bulk of the…
  • MSC Medite House, Ipswich
    MSC Medite House, Ipswich   This scheme involved the design and construction of a three storey landmark office building alongside the A14, incorporating a ground floor parking facility for 50 vehicles, a storage facility and open plan offices on two floors together with external paving works and drainage. A single storey link form the…
  • Cambridgeshire Guided Busway
    Cambridgeshire Guided Busway   This project involved the construction of the Longstanton Eco Exhibition Centre and remedial works to the Great River Ouse Bridge, St Ives Park and Ride and 13Km of guided bus track. The eco-building was built in conjunction with our sister company SEH French Construction.
  • Griffin Wharf, Ipswich
    Griffin Wharf, Ipswich   Working as a sub-contractor to our sister company SEH Ipswich, Jackson constructed a multi-storey concrete frame building as part of a development by Persimmon Homes in Griffin Wharf, Ipswich.The building consisted of 700 Continuous Flight Auger piles, pile caps, concrete columns, large podium slabs and various other higher floors,…
  • Ebbsfleet Station, Kent
    Ebbsfleet Station, Kent   Following completion of early civils work at Ebbsfleet Station, Jackson successfully tendered for the civils work package as a direct result of our proposal to use 100,000 tonnes of recycled type 1 sub-base in the car park construction, and a proactive single-team approach.The project included roads, forecourts and car…
  • A14 Orwell Bridge Bearing Replacement
    A14 Orwell Bridge Bearing Replacement   This involved the replacement of two bearings on North Pier Five of the Orwell Bridge which carries the A14 over the River Orwell in Suffolk. The bridge deck had to be jacked 8mm in order to remove and replace the bearings and this required the bridge to be closed…
  • Addenbrookes Rail Bridge
    Addenbrookes Rail Bridge   This project involved the construction of the 92m long, semi-integral, Nine Wells Rail Bridge which passes over the Cambridge to London line. This included the construction of reinforced concrete parapets, abutments, piers, wing walls, pile caps and part of the road embankments behind the abutments.
  • Sittingbourne Northern Relief Road
    Sittingbourne Northern Relief Road   Jackson was contracted to build a 1.9Km relief road around Sittingbourne in Kent to ease traffic congestion in the town. The carriageway was constructed across open fields, a heritage railway and service corridor, a closed landfill site and Milton Creek. The route required the construction of two steel and…
Subscribe to this RSS feed

Tweets

JacksonCivils's avatar
Jackson JacksonCivils
Loading...

Last 4 tweets from JacksonCivils:

People talking about '@JacksonCivils':


youtube-32x32
twitter-32x32facebook-32x32rss-32x32

  • Media
  • Sitemap
  • Contact us

 

goodworks Yellow GENERAL