• Home
  • Jackson...who?
    • Good Works
    • In a nutshell
    • Regions
    • People
  • Bread and Butter
    • Projects
    • Clients
    • Video
    • Cool stuff that made us proud
  • BoffinZone
    • Jackson Solutions
    • Nerdy stuff
  • It's a two-way street
    • Careers
    • Education
    • Community
    • News

Dartford Tunnel (West)

  • font size decrease font size decrease font size increase font size increase font size
  • Print Print
  • E-mail Send to a friend
Dartford Tunnel (West)

 

In 2010 Jackson Solutions advised Connect Plus on buildability issues associated with repairs to joints in the road deck in the West tunnel. Originally, the deck had been fabricated outside the tunnel and installed in sections, resulting in numerous joints. The drainage pipework beneath the deck also had to be replaced. On a section of road as busy as the Dartford crossing, long term road closures simply aren't an option, so all work had to be planned around night time closures. Jackson Solutions was commissioned on a time-charge basis to undertake night visits to the tunnel and observe the surfacing replacement work and inspect joints and drainage arrangements from beneath the deck. We then advised Connect Plus o how best to plan and execute the work within the limited access available.

  • Client: Connect Plus
  • Commission value: £4,500
Like this? Tweet it to your followers!
Tagged under
  • Tunnels
  • Jackson Solutions
  • Connect Plus
  • Highways
Social sharing
  • Add to Google Buzz
  • Add to Facebook
  • Add to Delicious
  • Digg this
  • Add to Reddit
  • Add to StumbleUpon
  • Add to MySpace
  • Add to Technorati

Related items (by tag)

  • Jackson starts work on £10m road improvement scheme
  • M1 Fire Emergency Works
  • Dartford QE2 Bridge
  • A14 Orwell Bridge Bearing Replacement
  • Sittingbourne Northern Relief Road
back to top
 


youtube-32x32
twitter-32x32facebook-32x32rss-32x32

  • Media
  • Sitemap
  • Contact us
  • Log In

 

goodworks Yellow GENERAL