South East Structures Framework
Client: Highways Agency
Approx. value: £5 - 7m per annum
Duration: 5 years
The purpose of the framework was to carryout structures schemes in the range £500k to £3.5m, covering HA Areas 3,4,5,6 & 8..
Typical works included under the framework were:
Bridges, bearings/joints, parapets, post-tensioned special inspection, concrete testing, strengthening, BACO parapet upgrade, edge beam strengthening, concrete repairs, gantries, painting, waterproofing, silane impregnation, viaduct upgrading, structural steelwork, structural concrete works, piling, ground anchorages, gabions, traffic management and temporary works.