Rotherham Canal Barrier

Grand canal barrier Gateway to growth and renewal A striking addition to the landscape, the Rotherham canal barrier has opened up development for the town’s regeneration. Our impact 450t Low-carbon concrete used in build 44t Embedded CO2 saved 50t Steel reinforcement used Symbol of regeneration Flooding from rivers and surface water is a perennial problem […]
Ouse Washes

Raising the Washes Maintaining a landscape through time First built in the 1600s, the Ouse Washes is an important flood defence but it needs ongoing maintenance to protect the surrounding land. Our impact 90M m3 Flood water storage 30km Reservoir length 487,000 Material tonnage required to complete the project The Ouse Washes reservoir is a […]
Stallingborough coastal defences

Hard rock story 90,000 tonnes of rock armour placed on Humber coastline Protecting properties, infrastructure and development zones. Our impact 90,000t Rock placed at Stallingborough 4.5km Stretch of coast protected £29m Flood defence upgrade 1.1bn Expected economic benefits over 25 years The 60-year old sea defences at Stallingborough required upgrading. Humber upgrade Stallingborough’s coastal flood […]
Wrangle pumping station

Pump up the volumetric flow rate Jackson oversees pumping station construction Two Archimedes screw pumps protect 2,000ha of fenland farms and communities Our impact 2,169ha Flood protection area 117 Residential properties protected 26 Businesses protected 2,300l/s Capacity of Archimedes screw pumps Working so close to a protected coastline required care throughout the operation. The old […]