Suffolk Park

Parklife Carbon reduction and local suppliers key to successful project Infrastructure for business park outside Bury St Edmunds. Our impact 18kg/t Carbon saving on surfacing 94% Percentage of recycled materials in asphalt used 116 Acreage of Suffolk Park The Jackson team constructed a number of link roads and footways to provide access to the business […]

Gateway 14

Opening the Gateway Value engineering cuts costs and reduces risk Infrastructure works on the largest business and logistics park in East Anglia. Our impact 50,000 50,000m3 excavated material remained onsite 6250 Estimated number of ‘muckaway’ lorry movements avoided 16,000 16,000m2  of type 1 aggregate not needed 20 Days cut from programme by using large auger […]

Derby Raynesway

Urgent works in Derby Failure would put critical infrastructure at risk Only 16 weeks to repair flood bank on the Derwent. Our impact 16 Project duration –  inception to delivery 2310 t Locally sourced rock armour placed 238 Loads  of specialist waste discharged 4370 t Tonnes of silt removed Tonnes of silt were removed. Storm […]

Boulby Mine

Tale of two towers Swap and demolition carried out in two-week window. Project involved sliding huge tower out before replacing it with new pre-constructed one. Our impact 2,7000t Weight of the old tower 54m Height of the tower 25kg Amount of C-4 explosive use for the demolition Only a fortnight was set aside foe the […]