Hullbridge Bank Stabilisation

Client: Environment Agency
Value: circa £5m 
Duration: 10 months 

Working from the water for much of the project, the Jackson team repaired a 40m length of collapsed embankment along the tidal estuary of the River Crouch in Essex.