Ashford Ring Road

Revamping Ashford Work rejuvenates town centre ring road Scheme involved complex series of diversions to underground services. Our impact 20+ Number of major service diversions 6m Cost of contract 15mths Duration of scheme High-specification road and footway materials were used for the scheme. Facilitating freedom of movement This exciting, award-winning urbanisation project saw Jackson charged […]
Warrior Square

Garden makeover Stunning refurbishment of Southend’s Warrior Square Gardens Project required co-ordination of multiple sub-contractors and liaison with the public. Our impact 1.8m Cost of park revamp project 3000m2 Area of improved park 15mths Duration of scheme The refurbishment included a bespoke continuous park bench. Cornerstone of town’s revival Through the careful co-ordination of multiple […]
Rathmore Road

Road scheme artfully done Project looks to the past and future at Gravesend Phased worked minimises disruption in Thameside town. Our impact 3.4m Cost of project 82weeks Duration of scheme 3 Number of schools involved in hoardings project The station concourse was redesigned to incorporate a drop-off point, disabled parking and new taxi rank. Improving […]
Tadcaster Road

Transforming Tadcaster Road Improvements to one of the busiest thoroughfares in York Creating a safer and more attractive environment in the cathedral city. Our impact 4km The length of the works 150 New gully connections 350m Of mainline drainage installed The improvements were intended to create a safer and more attractive environment. A cleaner, greener […]
Ickles Lock Flood Barrier

Watercolour A graphic reminder of what we’re really protecting Rotherham rises above the functional to turn flood prevention into a celebration of the people and the town. Our impact 125m Length of main flood wall 152 Number of 7m soil nails in the embankment 200m3 Concrete poured on main flood wall The main working area […]